PROFESSIONAL INDEMNITY DISCLAIMER: This document has been prepared by Cameron Facilities Pty Ltd (ABN 17 639 270 947) in its capacity as Building Manager. All technical data, observations and recommendations referenced in this document are drawn exclusively from the audit reports issued by One-Multi Pty Ltd (Plumbing Licence PL5482). Cameron Facilities Pty Ltd is not a licensed plumber, engineer or building surveyor and does not independently verify, warrant or guarantee the accuracy, completeness or technical validity of the findings, assessments or recommendations contained in the referenced audit reports. This document is provided for informational and building management coordination purposes only and does not constitute professional plumbing, engineering, structural or legal advice. Cameron Facilities Pty Ltd accepts no liability whatsoever for any loss, damage or claim arising from reliance on the information in this document or the underlying audit reports. All lot owners, the strata company, and any other party are strongly encouraged to obtain their own independent professional advice before making any decisions or undertaking any works based on the contents of this document.
RESPONSIBILITY: Lot Owner = s.116 Strata Titles Act 2018 (WA). Strata Company = s.115 Strata Titles Act 2018 (WA). All works are allocated by responsibility under the Strata Titles Act 2018 (WA) as indicated in the audit reports prepared by One-Multi Pty Ltd.
| Unit | Level | HWU Brand | Age | Condition | Pressure | Priority | Repipe Risk | Works Status | Key Issues |
|---|---|---|---|---|---|---|---|---|---|
| Loading data... | |||||||||
| Contractor | Trade | Type | Contact | Phone | Licence | Insurance Exp | Value | Status |
|---|---|---|---|---|---|---|---|---|
| Loading contracts... | ||||||||
| Task | Trade | Frequency | Contractor | Last Completed | Next Due | Compliance | Status |
|---|---|---|---|---|---|---|---|
| Loading PPM schedule... | |||||||
| Unit | Work Category | Description | Responsible | STA Ref | Urgency | Quote (ex GST) | Group | Status |
|---|---|---|---|---|---|---|---|---|
| Loading works register... | ||||||||
Recent Work Orders
| WO No. | Category | Description | Raised | Contractor | Status | Cost |
|---|---|---|---|---|---|---|
| WO-QTR-001 | Plumbing | Riser isolation valve replacement | 02/06/2026 | Perth Plumbing Group | In Progress | $2,450 |
| WO-QTR-002 | Electrical | Emergency light testing and replacement | 28/05/2026 | Metrowest Electrical | Complete | $890 |
| WO-QTR-003 | Fire Services | Fire panel inspection and defect rectification | 20/05/2026 | Fire Shield Services | Complete | $1,680 |
| WO-QTR-004 | Building | Lobby glass door closer adjustment | 05/06/2026 | Perth Door Systems | Open | $320 |
| Category | 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 10-Year Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| Isolation Valve/PRV | $48,000 | $7,000 | $4,000 | -- | -- | $12,000 | $4,000 | -- | -- | $12,000 | $87,000 |
| External Leak Rectification | $28,000 | $12,000 | $8,000 | $6,000 | $6,000 | $8,000 | $12,000 | $6,000 | $6,000 | $8,000 | $100,000 |
| Balcony Waterproofing* | $40,000 | $40,000 | $30,000 | $10,000 | $10,000 | $10,000 | $35,000 | $35,000 | $30,000 | $10,000 | $250,000 |
| Common Plumbing Maintenance | $8,000 | $8,000 | $8,000 | $8,000 | $8,000 | $8,000 | $8,000 | $8,000 | $8,000 | $8,000 | $80,000 |
| Building Condition Assessments | $5,000 | -- | -- | $5,000 | -- | -- | $5,000 | -- | -- | $5,000 | $20,000 |
| SUBTOTAL STRATA | $129,000 | $67,000 | $50,000 | $29,000 | $24,000 | $38,000 | $64,000 | $49,000 | $44,000 | $43,000 | $537,000 |
| Category | 2026 | 2027 | 2028 | 2029 | 2030 | 2031 | 2032 | 2033 | 2034 | 2035 | 10-Year Total |
|---|---|---|---|---|---|---|---|---|---|---|---|
| HWU Urgent (7 units) | $66,000 | -- | -- | -- | -- | -- | -- | -- | -- | -- | $66,000 |
| HWU Planned (5 units) | $12,000 | $21,000 | $15,000 | $9,000 | -- | -- | -- | -- | -- | -- | $57,000 |
| HWU Future Projection | -- | -- | $8,000 | $21,000 | $25,000 | $21,000 | $18,000 | $18,000 | $21,000 | $25,000 | $157,000 |
| Repipe Works (PB/Ipex -- 18 units confirmed) | $100,000 | $100,000 | $80,000 | $60,000 | $50,000 | $40,000 | $40,000 | $40,000 | $40,000 | $30,000 | $580,000 |
| Wet Area Reseal | $35,000 | $35,000 | $35,000 | $18,000 | $15,000 | $15,000 | $45,000 | $45,000 | $45,000 | $18,000 | $306,000 |
| General Plumbing | $55,000 | $45,000 | $40,000 | $32,000 | $28,000 | $28,000 | $28,000 | $28,000 | $28,000 | $28,000 | $340,000 |
| Access Hatches | $10,000 | $5,000 | $3,000 | -- | -- | -- | -- | -- | -- | -- | $18,000 |
| SUBTOTAL OWNER | $293,000 | $200,000 | $165,000 | $127,000 | $108,000 | $85,000 | $100,000 | $100,000 | $103,000 | $76,000 | $1,357,000 |
| GRAND TOTAL | $422,000 | $267,000 | $215,000 | $156,000 | $132,000 | $123,000 | $164,000 | $149,000 | $147,000 | $119,000 | $1,894,000 |
1. Figures are based on 43-unit confirmed audit data (48.3% sample), extrapolated to 89 units for whole-building projection using a 2.07x factor (89/43). More reliable than prior 29-unit basis.
2. Inflation at 3.5% per annum has NOT been included -- all figures are in 2026 dollars.
3. Balcony waterproofing (*) is classified as common property under s.119 Strata Titles Act 2018 (WA) where the waterproofing membrane serves a structural or protective function. Final determination subject to strata by-laws and legal interpretation.
4. Repipe works SIGNIFICANTLY REVISED: 18 of 43 audited units (41.9%) confirmed with Ipex grey or polybutylene pipe prone to catastrophic failure. Extrapolated to 89 units = approximately 37 units requiring full repipe. This is now the single largest capital item at $580,000 over 10 years.
5. HWU future projection assumes average 15-year replacement cycle based on manufacturer specifications. Group purchase eligible units increased to 12.
6. All quotes are ex GST. 14-day payment terms apply to all works.
2. Commission an updated 10-year sinking fund plan incorporating the plumbing audit findings and CapEx forecast above.
3. Present the isolation valve/PRV works ($14,000 -- $17,000) to the Council of Owners for urgent approval -- these are building infrastructure items under s.115.
4. Engage an independent quantity surveyor to validate the 10-year CapEx projections for insurance and compliance purposes.
5. Establish a special levy mechanism or increased sinking fund contributions to cover the Year 1 strata capital requirement of $137,000.
6. Determine the legal position on balcony waterproofing responsibility under s.119 Strata Titles Act 2018 (WA) before the next Council meeting.
7. Review building insurance policy to confirm adequacy of cover for water damage claims arising from plumbing failures.
8. Submit all confirmed strata works to Chambers Franklyn for formal quotation and Council approval process.
| Riser | Units | Levels | Isolation Valve Status | Risk | Strata Action | Est. Cost |
|---|---|---|---|---|---|---|
| Riser A | 301, 701, 901 | 3, 7, 8, 9+ | 701: Unable to shut off | HIGH | YES | $1,500 -- $1,800 |
| Riser B | 302, 802 | 3, 8+ | 802: Non-operational. PRV actively leaking | CRITICAL | YES -- URGENT | $1,800 -- $2,100 |
| Riser C | 703 | 3-7+ | Unable to shut off | HIGH | YES | $1,500 -- $1,800 |
| Riser D | 304, 404, 804 | 3, 4, 8+ | Access blocked (hatches needed) | MEDIUM | Monitor | $590 -- $720/hatch |
| Riser E | 705, 805, 905 | 5, 7, 8, 9+ | Two failures on same riser | CRITICAL | YES | $1,500 -- $2,100/unit |
| Riser F | 706, 806, 906 | 6, 7, 8, 9+ | 706: No handle. 906: Not fully operational | HIGH | YES | $1,500 -- $2,100/unit |